Nhon Trach VI Industrial Park – Dong Nai
OVERVIEW
Nhon Trach 6 Industrial Park is located on an important traffic hub of the Southern Key Economic Zone and has many favorable conditions in terms of road, waterway and airway to attract investment and develop socio-economics.
Nhon Trach 6A Industrial Park Construction Investment Co., Ltd. is the investor of Nhon Trach 6 Industrial Park with a total area of 314.23 ha, including industrial sub-zones 6A, 6B, 6C, 6E. Charter capital scale is over VND 1,000 billion
GEOGRAPHICAL LOCATION
Convenient traffic connection
Highway:
- HCM-Long Thanh- Dau Giay: 3km
- Ben Luc – Long Thanh: 4km
- National Highway 51: 7km
Airport:
- Long Thanh Airport: 10km
- Tan Son Nhat Airport: 45km
Port:
- Phuoc An Port: 10km
- Cat Lai Port: 22 km
- Phu My Seaport: 35km
- Vung Tau Seaport: 60km
Train station:
- Bien Hoa Station: 40km
- Song Than Station: 50km
City:
- Center of HCMC: 30km
- Bien Hoa City Center: 35km
- Thu Dau Mot City Center: 61km
INFRASTRUCTURE
Traffic:
- Main traffic system: 25m right-of-way – 30 tons of load, 4 lanes dedicated to traffic connecting to surrounding traffic infrastructure.
- Internal traffic system: Right-of-way from 8-20m
Electricity supply
- Total capacity: 189 MVA
- Substation - phase I: 63 MVA
- Existing overhead power lines along the Industrial Park's roads with immediate connection capabilities.
- Power supply to customer's factory: 22Kv.
Water supply
- Source: Nhon Trach Water Plant, Ho Cau Moi Water Supply Plant
- Capacity: 120,000m3/24h
- Stable, quality water supply service and always guaranteed for the continuous operation and convenience of our customers
Wastewater treatment
- Wastewater treatment plant applies advanced technology with the ability to receive wastewater with high load
- Total capacity: 90,000m3/24h
- Phase I – in operation: 40,000m3/Day.night
For customers 2 options:
- Invest in the cost of building a separate wastewater treatment station
- No need to invest in the cost of building a wastewater treatment station for the factory
Telecommunications
- Telecommunications infrastructure system has been completed along the roads
Industrial Park. - Transmission speed parameters:
- ADSL: Up to 8 Mb/s
- Fiber optic cable: up to 90MB/s.
Gas supply
- Supplier: PV Gas Nhon Trach
- Category: Natural gas
The low-pressure gas distribution system has been fully invested inside the Industrial Park and is ready for connection as directed by the customer.
INVESTMENT INCENTIVES
Corporate income tax: 20%
Preferential treatment and tax exemption
- Tax incentives: 100% exemption for the first 2 years and 50% for the next 4 years.
Insurance
- Social insurance: 25.5% (of which the enterprise pays 17.5%; the employee pays 8%).
- Health insurance: 4.5% (of which the enterprise pays 3%, the employee pays 1.5%)
- Unemployment insurance: 2% (of which the enterprise pays 1%, the employee pays 1%)
Our services:
With many years of experience in consulting on land law, and surveying and working with management boards of industrial parks and foreign investors in industrial parks, we provide a comprehensive service package for domestic and foreign investors in industrial parks nationwide, including:
- Consulting on land law, real estate
- Survey and visit factory and land services in industrial parks
- Legal services for applying for business licenses and investment certificates
VIEW MORE FULL INFORMATION DETAIL