I. LEGAL INFORMATION AND LOCATION OF NAM BINH XUYEN INDUSTRIAL PARK
Nam Binh Xuyen Industrial Park is planned to be included in the plan of industrial parks in Vinh Phuc under Official Dispatch No. 1581/TTg-KTN dated September 03, 2009 issued by the Prime Minister with a predicted planned area of 304 hectares.
On January 07, 2022, Nam Binh Xuyen Industrial Park was approved by Vinh Phuc Provincial People's Committee for its detailed construction plan at a scale of 1/500 under Decision No. 36/QD-UBND. Accordingly, the industrial park has a total planned area of 295.74 hectares, of which the industrial park construction land area is 290.152 hectares (the industrial land area for lease is 200.41 hectares, accounting for 69.07%), the 220kV high-voltage power line corridor is 5.588 hectares and is kept intact. The industrial park is planned to be located in Huong Canh and Dao Duc towns and Phu Xuyen and Tan Phong communes, Binh Xuyen district, Vinh Phuc.
On March 19, 2021, Nam Binh Xuyen Industrial Park was approved for investment under Decision No. 399/QD-TTg issued by the Prime Minister. The project's investor is Nam Binh Xuyen Green Park Development Co., Ltd (a company established by two international investors, J&D Partners Company Limited and VK Investment Consulting Company Limited) with an investment capital of more than 2,200 billion VND. In terms of nature, Nam Binh Xuyen Industrial Park is planned as an industrial park to attract and arrange the following types of industries: software production, information technology, electronics and telecommunications, assembly of components and machinery; mechanical production, household appliances, consumer goods; production of aviation industrial accessories applying modern technology, causing little environmental pollution.
In terms of regional linkage, Nam Binh Xuyen Industrial Park is planned to be located in the North adjacent to the 220 KV power line, in the West adjacent to the agricultural land and residential area of Phu Xuan commune, in the East and South adjacent to the Nam Binh Xuyen urban area and residential area, at the same time, convenient traffic connection:
- 21.8 km from Noi Bai International Airport
- 48 km from Ha Noi city center
- 10 km from Vinh Yen city center
- 4.5 km from Ha Noi - Lao Cai expressway interchange
II. INFRASTRUCTURE SYSTEM OF NAM BINH XUYEN INDUSTRIAL PARK
Power supply system: the power supply for manufacturing at Nam Binh Xuyen Industrial Park is sourced from the national power grid through Vinh Yen 220/35/22 KV substation, Huong Canh town, Binh Xuyen district. 35/22 KV lines are installed overhead through a system of centrifugal concrete poles, delivering electricity to each plot within the industrial park.
Water supply system: the clean water used for manufacturing at Nam Binh Xuyen Industrial Park is sourced from the plant of Vinh Phuc Clean Water Joint Stock Company with pipelines connected to the fence of the site.
Wastewater treatment system: all wastewater from manufacturing activities at the industrial park is treated through a centralized wastewater treatment station with a capacity of 6,100 m3/day and night, reaching Standard A before being discharged into Ca Lo and Phan river.
Telecommunication system: designed underground through technical sewers, technical cable boxes arranged along traffic routes in the industrial park.
Internal traffic system: the cross-section of the main roads of Nam Binh Xuyen industrial park has a cross-section width of 41m, 46m, 50m, the branch roads have a cross-section width of 13.5m to 26.5m for convenient traffic in the industrial park.
Fire fighting and prevention: the fire protection water supply system is used together with the civil water supply pipeline, with a diameter of D100, arranged on the main and branch roads of the industrial park. At the same time, the industrial park also has a backup fire protection water supply station built.
Rainwater drainage system: the rainwater drainage system of Nam Binh Xuyen Industrial Park is designed separately, independent from the wastewater treatment system and is divided into 9 discharge gates to Ca Lo river and Phan river. At the same time, the Industrial Park is leveled with a construction elevation of +9.40m to +10.30m, while the traffic routes have an elevation of +9.70m to +11.55m, helping the industrial park avoid flooding.
Other infrastructure facilities: In addition to technical works, Nam Binh Xuyen Industrial Park also has parking lots and landscape trees, water surface, and regulating lakes.
III. STATUS QUO OF ATTRACTING INVESTMENT IN NAM BINH XUYEN INDUSTRIAL PARK
According to the plan, Nam Binh Xuyen Industrial Park is expected to be implemented in 2 phases, phase 1 has a scale of 150 hectares, expected to be put into operation in 2024, phase 2 has a scale of more than 140 hectares, expected to be put into operation in 2026. Currently, the investor is coordinating with Vinh Phuc Provincial People's Committee in clearing the ground for phase 1 and will soon start construction.