I. OVERVIEW OF DAI AN EXTENSION INDUSTRIAL PARK
Dai An Extension Industrial ParkII. INFRASTRUCTURE OF DAI AN EXTENSION INDUSTRIAL PARK
Power supply system: Guaranteed supply from the 110 KV/22KV Dai An substation, 22KV power lines are readily connected to each leased land plot in the Industrial ParkWater supply system: The production water source in Dai An Industrial Park is taken from the Hai Duong Clean Water Plant managed by Hai Duong Clean Water Company with a water supply capacity of 20,000 m3/day and night, and pipelines are connected to the fences of each factory in the industrial park
Wastewater treatment system: Dai An Industrial Park has an on-site centralized wastewater treatment plant with a treatment capacity of 5,000 m3/day and night, with the ability to treat output wastewater meeting standard A according to Vietnam's environmental technical standards
Internal traffic system: The main roads in the Industrial Park are designed with a right-of-way width of 30-55 meters, branch roads with a width of 17.5 m are completed with concrete structure and Asphalt pavement, well meeting the transport capacity of large specialized vehicles such as Container trucks in the Industrial Park
Information and communication system: Installed and implemented by telecommunications infrastructure service providers according to the needs of land leasing investors.
Fire protection system: Fire hydrants are arranged at traffic junctions and in front of each factory in the Industrial Park, ensuring fire prevention and rescue


III. LAND LEASE COSTS IN DAI AN EXTENSION INDUSTRIAL PARK
Infrastructure usage fee: 95 USD/m2/until the end of the lease termInfrastructure management and maintenance fee: 0.7 USD/m2/year
Raw land rental: According to the decision of the Hai Duong Provincial People's Committee
Wastewater treatment fee: from 12,500 VND/m3, depending on the quality of incoming wastewater
Water supply price: 14,500 VND/m3 (Adjusted according to the Decision of the Hai Duong Provincial People's Committee)
Electricity price: Applied according to EVN's electricity price schedule
IV. CURRENT STATUS OF INVESTMENT ATTRACTION IN DAI AN EXTENSION INDUSTRIAL PARK
Currently, phase 1 of Dai An Extension Industrial Park with a scale of 189.02 ha has been filled by over 85%, the remaining land area is only enough to serve the expansion of projects operating in the Industrial Park, phase 2 of the project with a scale of 227.19 ha has beenTypical projects in the industrial park include: Electronic component manufacturing project of Suntel Vina Co., Ltd.; Metal production project of KPF Vina Co., Ltd.; Automotive parts production project of Huyndai Kefico Vietnam Co., Ltd...