Chau Son Industrial Park - Ha Nam
(CHAU SON -IP - HN)
Overview of Chau Son Industrial Park
Phu Ly-Ha Nam city is located at the gateway to the south of Hanoi, located in the northern key economic region and also is the confluence of the confluence of the Day, Chau Giang and Nhue Rivers. With the above conditions, Phu Ly City meets all conditions to develop service and trade economy, especially in the development of industrial industries. Typical for economic development of Phu Ly is the development of Chau Son Industrial Park.
Chau Son industrial park is located in Chau Son and Le Hong Phong wards (Phu Ly city), Thanh Son commune (Kim Bang district) and Kien Khe town (Thanh Liem district), Ha Nam province; The total planned area is 377ha. The area of infrastructure construction investment is 317.5 ha with an industrial area of 211.8 ha. In particular, Phase I is directly invested in infrastructure and phase II by VPID Ha Nam One Member Limited Liability Company is an infrastructure investor on an area of 115ha. The leased area is 178.86ha, reaching the occupancy rate of 84.2% and there are still about 33ha of land available for investors to rent.
Not only that, in 2018, Chau Son Industrial Park, the Prime Minister, approved the investment policy of Chau Son industrial park infrastructure investment and construction project to expand the project scale: 59.53 ha; investment of the project: 274.14 billion VND, of which: capital contribution of investors is 85 billion VND, mobilized capital is 189.14 billion VND.
Chau Son Industrial Park is oriented to develop with high-tech and environmentally friendly industries such as: Manufacturing, assembling, automobiles, motorbikes; Electricity, electronics, telecommunications, information technology. believe; supporting industries, new materials; Processing and preserving agricultural products, foodstuffs, beverages and milk ...
Geographic location and traffic
- Internal traffic: complete internal traffic
- Outbound traffic:
- Railway: Thinh Chau Station is located close to the eastern boundary of the Industrial Park
- Waterway: Thinh Chau port on Day river (200T train runs) - 500m away
- Road: 2km from National Highway 1A and 2.5km from old Road 21.
- Distance from some major airports and ports:
- The center of Hanoi: 55km
- Noi Bai International Airport: 85km
- How to Hai Phong port: 135km
- Distance from Cai Lan port - Quang Ninh: 150km
- 500m from Thinh Chau port on Day River (200-ton boat can pass)
- Distance to Hoang Gia golf course (formerly known as Yen Thang golf course) in Tam Diep town - Ninh Binh: 45km
The internal road system is reasonably designed to ensure easy and convenient access to factories. Central road is 32m wide and 23m wide. Electric lighting system is installed along the roads
Infrastructure and other utilities
- Electricity supply: 35KV electricity supply from Ha Nam Electric Company and electricity price according to electricity industry price (about VND 1,000 / KW).
- Water supply: Direct water source from Ha Nam Water Supply Company (design capacity 30,000m3 / day and night) and unit price of clean water: at the price of Ha Nam Water Supply Company for Industrial Park (10,000 VND / m3) ).
- Telecommunication: Viettel post and telecommunication system.
- Waste water treatment: under construction of a wastewater treatment plant with a capacity of 1,500m3 / day and night.
- Waste treatment: Solid waste from factories in the industrial zone will be sorted, collected and transported to the gathering place of the industrial park for treatment.
- Finance: Banks system such as Vietinbank, Vietcombank, BIDV, DongA, Sacombank, Agribank ...
- Housing for workers: Housing areas are being planned and built in Urban Areas invested by Hanoi Urban Development Company (HUD).
- Other facilities: Water supply system and fire hydrants are located along the Industrial Park roads.
Investors participate in Chau Son industrial zone
Thanks to efforts in attracting investment, with the red carpet policy to welcome investors, Ha Nam province is always in the Top 10 localities nationwide in terms of attracting foreign investment.
At the same time, the province organized investment promotion missions abroad; establishment of Korea and Japan Investment Support Center to support businesses; Signing cooperation agreement on economic and cultural exchange and supporting investment promotion, attracting investment into Ha Nam province with Hyogo, Hiroshima, Kobe (Japan) and Gyeonggi-do provinces and Associations Korean exchange - KOVEA (South Korea).
Thanks to the above guidelines and policies, combined with favorable geographical location and transportation, Chau Son Da Industrial Park attracts a lot of domestic and foreign investors to participate: Especially in phase 2 of the Industrial Park. Chau Son has a lot of businesses building business facilities (mainly investors from South Korea) with the land area allocated to investors over 50 hectares, accounting for about 60% of the area. industrial land. Investors in Chau Son Industrial Park specialize in manufacturing pharmaceuticals, electronic components, garments, rubber products, electronic accessories, and textiles, creating jobs for more than 5,000 employees.
Investment costs in Chau Son industrial park
The rental price has infrastructure: 50 USD / m2
Electricity price: According to EVN"s price
Water price: VND 11,500 / m3 excluding VAT and VND 300 for environmental protection fees
Labor cost: Reference price: 200-500USD / person / month.
Solid waste treatment fee: According to the regulations of the provincial People"s Committee and of the Management Board of Industrial Zones
Waste water treatment fee: According to the regulations of the Provincial People"s Committee and of Industrial Zone Management Board
Management fee: USD 0.3 / m2 / year - annual payment
Labor source of Chau Son industrial park
According to 2019 statistics, the population of Dong Van town is: 852,695 people. Ha Nam province has a population of about 1.5 million people, of which 65% are workers under 35 years old. This is an abundant source of labor, along with labor from other neighboring provinces, so it can provide sufficiently for Enterprises in the Industrial Park.
The system of colleges, intermediate schools, vocational training in the region is very diverse. Excluding vocational schools managed by the district town. Ha Nam province has about 10 vocational training schools with a staff of over 500 and over 10,000 students per year (such as Ha Nam Pedagogical College, College of Broadcasting, and Secondary Water School. benefits, woodworking workers school, Post and Telecommunications High School 1, Ha Nam Medical High School ...)
Moreover, the distance from the center of Hanoi City to the Industrial Park is about 45 km, the Bus System ensures the daily work force from Hanoi to the Industrial Park conveniently and easily.
Investment incentives in Chau Son industrial park
Preferential mechanisms and policies for enterprises and investors: For enterprises investing in industrial production
- The province hands over clean land to investors to invest in the project;
- The province invests in infrastructures to the foot of enterprises" fence, including roads, power supply systems, telecommunications, water supply and drainage, and wastewater treatment systems;
- The land lease contract lasts up to 50 years;
- Exempt land rental from 3 -15 years for projects on the list of provincial investment encouragement;
- Tax exemption for the first 2 years and a 50% reduction for the next 4 years;
- To adopt policies to support training and labor recruitment for businesses.
- Investment procedure: one door and one door connecting
Our services
Through years of experience working with industrial park management, serving many domestic and foreign investors, we have experience in providing the following services:
- Land consulting, factory visit
- Procedures, conditions, business licenses, investment certificates in Vietnam
- Drafting, Negotiating, Contracting
- Legal advisory
Status: updated in September 2019 by Kland
Chau Son Industrial Park has only a few plots of land that can be traded to investors. Please contact Kland for advice.
For details, please refer to the parameter table below.