Chau Duc - Ba Ria Vung Tau Industrial Park
Overview of Chau Duc Industrial Park in Ba Ria Vung Tau province
Chau Duc Industrial Park is located in the two communes of Nghia Thanh and Suoi Nghe, Chau Duc district, invested and built by Sonadezi Chau Duc Joint Stock Company since 2007 with a scale of 2,287 ha. Chau Duc has been completing the technical infrastructure, in parallel with that, many factories in the industrial park are being completed quickly by the investor to meet the needs of renting factories in Chau Duc Industrial Park in particular and Demand for manufacturing factories in the province of Ba Ria - Vung Tau in general.
As a bright spot in attracting investment in Ba Ria-Vung Tau, Chau Duc Urban Industrial Park is expected to attract about 80,000 employees, including about 10,000 local workers and strive to 2020 the rate of 50% of the industrial park is filled, thereby, Chau Duc Urban Industrial Park is expected to become the center of attracting investment in the coming time, creating an impetus to promote socio-economic development of Ba Ria province. Ria-Vung Tau as well as the southern key economic region.
Photo of Chau Duc Industrial Park
Location and planning of Chau Duc - Ba Ria Vung Tau Industrial Park
Located in Nghia Thanh, Suoi Nghe commune, Chau Duc District; Song Xoai, Chau Pha commune, Tan Thanh District; Ba Ria Vung Tau Province.
Being one of the major complex industrial parks of the country with a total area of 2,287 ha, including 1,556 ha of industrial park area for rent, 689 ha of Chau Duc urban area & Golf course and 42 ha of outer land. The urban area is planned to be built synchronously with all functional areas and utility services, the location is extremely convenient for transportation,
- About 6km from Highway 56, Highway 51 nearly 13km
- From Thi Vai Port 16km.
- 19km from Cai Mep port.
- 21km from Go Dau port.
Close to the important traffic road and seaport, Chau Duc Urban Industrial Park not only meets production requirements, saves costs and time. cargo space for domestic and foreign investors, but also to meet the daily living requirements of workers. working inside and outside industrial zones.
The technical infrastructure in Chau Duc Urban Industrial Park is modernly and synchronously invested with the North-South central axis, consisting of six lanes with a separating line of 2m and a width of 54m, the side roads have two lanes and roads. About 29m
The North-South trunk road of the area includes 06 lanes, 02 m median, and 54 m width of road. Minor roads have 02 lanes, 29 m wide.
Geological:
- From 1m to 3.5m : 9.31 tons/ sqm
- From 3.5m to 6.5m : 16.33 tons/ sqm
- From 6.5m - 12m : 31.68 tons/ sqm
POWER SUPPLY SYSTEM
Facilities: Two transformer stations of 110/22 KV with capacity 2x63 MVA each.
- Electricity charge: price offered by Electricity Company of
Vietnam for voltage from 22KV to under 110 KV
* Peak time : VND 2,871/kWh
* Off peak : VND 1,007/kWh
* Normal time : VND 1,555/kWh
(Prices are not inclusive of VAT, subject to change under Government regulations)
WASTEWATER TREATMENT SYSTEM:
- Investing in 03 concentrated waste water treatment plants with a total estimated processing capacity of about 45,000 m3 /day.
- Waste water to be treated: domestic wastewater and production wastewater
- Charged volume is equal to 80% of supplied water.
Internal road infrastructure in Chau Duc Industrial Park
The communication network, gas supply, electricity supply, clean water supply, waste water treatment, fire prevention and fighting are all completely arranged.
Preferential policies for investors when renting land in Chau Duc Vung Tau Industrial Park
With outstanding investment incentive policies including income tax rate of 17% for 10 years, and 02 years of tax exemption and 50% tax reduction for the next 4 years, Chau Duc Urban Industrial Park will welcome more Investors.
On the other hand, in order to create the best support for investors, Chau Duc Industrial Park develops many rental workshops to welcome investors with workshop area of 1,600 m2 or more, synchronous infrastructure. Technical industrial park with rental price from 4 USD / m2 / month (excluding VAT)
Chau Duc Industrial Park is a typical industrial area, extremely prominent, has many advantages in both geographical location and investment incentive policies and promises to be a promising land for investors in need. Investment in Ba Ria - Vung Tau province.
Some major industries that encourage investment in Chau Duc - Vung Tau Industrial Zone
With the motto that production must be linked to the protection of a new living environment for sustainable development, Chau Duc Urban Industrial Park is built in the direction of prioritizing investment in the development of modern industries, which cause less environmental pollution such as: Assembling and manufacturing electronic components, computers and semiconductors; Cables and telecommunication materials; Pharmaceuticals, medical equipment; Precision engineering, manufacturing air-conditioners, washing machines; Processing industries of gold, silver, gemstones, diamonds and precious metals; Mechanical processing, steel structures; Assembling bicycles, motorbikes, cars and special-use vehicles; Processing agricultural products, agricultural chemicals, food and beverages (not processing tapioca starch); … ..And especially focused on creating a green area for the Industrial Park by greening all internal transportation routes and the entire campus, this green area is not only meant to create shade but also create landscape, so The plants and ornamental flowers in the area are carefully and scientifically calculated.
Some typical investors in Phu My 3 Industrial Park
Chau Duc Ba Ria Vung Tau Industrial Park has attracted many foreign investors to rent land, build production plants, such as: SONADEZI CHAU DUC, Aurelial (United Kingdom) PVCM, Makigan, Solar Farm (Korean) , Dejuvina, Sungjin (China), ...
Cost of renting a land or workshop in Chau Duc- Ba Ria Vung Tau Industrial Park
1. Rental (*):
- Price : 1,292,500 VND/ sqm /until 2058
- Management fee : 11,750 VND/ sqm /year
All charges above do not include VAT and Valid to 31/03/2020
2. Method of payment:
- One-time payment for whole leasing life.
- Progress of payment is divided into 3 times correlatively with
50%, 40%, 10% within 06 months.
(*) Price subject to change according to current condition
Ready built Factory for lease
- Production Factory : 40m x 40m = 1,600 sqm
- Office building : 20m x 8m x 2 = 320 sqm
- Production Factory : 40m x 40m = 1,600 sqm
- Office building : 20m x 8m x 2 = 320 sqm
- Production Factory : 30m x 80m = 2,400 sqm
- Office building : 20m x 8m x 2 = 320 sqm
- Price(*) : 82,250 VND/sqm/month
(Not inclusive VAT; for factory and office area) and increase at maximum 15% after every five years.
- Management fee : 11,750 VND/sqm/year (Not inclusive VAT, for the land area)
- Deposit : 06 months’ rental price.
- Payment methods: paid quarterly, at the first month of each quarter of year.
- Minimum Leasing Period: 05 years.
(*) Price subject to change according to current condition
Please contact Kland for legal advice on land rent, preferential policies, procedures for obtaining investment certificates, business registration for investors.
VIEW MORE FULL INFORMATION DETAIL