I. LEGAL INFORMATION AND LOCATION OF DEEP C II INDUSTRIAL PARK
DEEP C II Industrial Park Hải Phòng has a total area of 646.1 hectares and is a complex comprising 02 industrial parks:
Deep C2A Industrial Park (renamed from Nam Dinh Vu Industrial Park Phase 2).
- Established in 2009, with the investor being Hong Duc Industrial Joint Stock Company (a cooperation between the investor Rent-A-Port Company of Belgium and the People's Committee of Hải Phòng city) with a total investment capital of over VND 2,468 billion
- Has a planned area of 513.4 hectares, of which the industrial land area is 397.55 hectares (accounting for 77.43% of the area)
- Location: Dong Hai 2 Ward, Hải An District, Hải Phòng City
- Operating term: From 2009-2059
Deep C2B Industrial Park (renamed from the Service and Maritime Industrial Park).
- Established in 2011, with the investor being Hải Phòng Industrial Park Joint Stock Company with a total investment capital of VND 505 billion.
- Has a planned area of 132.7 hectares, of which the industrial land area is 102.4 hectares (accounting for 77.16% of the area)
- Planned location: Dong Hai 2 Ward and Tràng Cát Ward, Hải An District, Hải Phòng City
- Operating term: From 2011-2061

In terms of nature, DEEP C II Industrial Park Hải Phòng is a modern multi-sector industrial park including heavy industry, general light industry (including textiles and garments and inputs for the textile and garment industry), pharmaceutical industry and other industries as prescribed; logistics and port logistics services...within the boundaries of Dinh Vu - Cat Hai Economic Zone.
In terms of regional connectivity, DEEP C II Industrial Park is located in a strategic position on the Nam Dinh Vu peninsula, conveniently connected to the seaport system, airport and important transportation routes, specifically:
- 9.4 km from Dinh Vu port, 15.6 km from Lach Huyen port
- 15 km from Hải Phòng city center, 12.8 km from Cat Bi airport
- 5 km from the Hanoi - Hải Phòng expressway intersection
- 120 km from Hanoi city center, 137 km from Noi Bai airport II. INFRASTRUCTURE SYSTEM OF DEEP C II INDUSTRIAL PARK, HAI PHONG
Power supply system: The power source for production at DEEP C II Industrial Park is supplied from two sources. In the short term, the power supply is taken from the 110kV/22kV substation of Dinh Vu Industrial Park. In the long term, the power source is supplied through a 110kV/22kV substation with a capacity of 63 MVA built within the industrial park. The 22kV power lines are underground and connected to each plot of land in the industrial park.
At the same time, the industrial park also has a 22/0.4kV substation with a capacity of 250kVA/630kVA to serve public works and the lighting system.
Water supply system: In the short term, the water supply for DEEP C II Industrial Park is taken from the existing An Duong water plant, in the future the water supply will be supplemented from the Hung Dao water plant, Duong Kinh district. The industrial park is invested in building a booster pumping station located in the West of the industrial park with an expected capacity of about 20,000 m3/day and night. The water supply network is arranged in a loop-branch form with HDPE pipes with diameters from D100-D500.
Wastewater treatment system: All production wastewater in Deep C 2 Industrial Park Hải Phòng is treated through a centralized wastewater treatment plant with a treatment capacity of 16,000 m3/day and night to standard A before being discharged into the environment.
Internal traffic system: The main road in the industrial park has a width of 50m-56m, of which the road surface width is from 18m-30m with 08 lanes and a median strip and water ditch in the middle. The branch roads in the industrial park have a cross-sectional width of 21m-45m, of which the road surface width is from 10m-16m. At the same time, the entire road traffic system in the industrial park is also arranged with green trees and lighting on both sides.
Fire protection system: The fire protection water supply system is arranged independently and separately from the clean water supply system for production. Fire hydrants are arranged with a distance of 150m/pillar to ensure the handling of fire incidents occurring in the industrial park.
Telecommunications system: The telecommunications system of the industrial park is connected to the telecommunications network of Hải An district with an expected exchange capacity of 4,000 lines. DSLAM access equipment is installed in the industrial park to ensure the needs of using broadband and high-speed Internet services for businesses operating in the industrial park.
III. RENTAL PRICE AND INVESTMENT INCENTIVES AT DEEP C II INDUSTRIAL PARK
Infrastructure rental price: 115 USD/m2/entire lease term. The rental unit price may vary depending on the area and location of the leased land plot.
Infrastructure management and maintenance fee: 0.089 USD/m2/month
Annual land rent: Land rent is waived for the entire lease term (50-year land lease form with annual rent payment)
Electricity supply price: applied according to EVN's electricity supply price list and surcharges depending on the investor's electricity usage needs.
Clean water supply price: 20,200 VND/m3, may be changed from time to time
Wastewater treatment fee: 0.9 USD/m3, the volume of wastewater is calculated as 80% of the volume of clean water used as input
Other costs: Collected by the supplier depending on the actual usage needs of the business
Note: The above unit prices do not include VAT and are subject to change without prior notice
Investment incentives at DEEP C II Industrial Park
Corporate income tax incentives: Investment projects in DEEP C II Industrial Park enjoy a very large tax incentive policy because the industrial park is located in the Dinh Vu - Cat Hai economic zone. Specifically, a tax rate of 10% is applied for the first 15 years of the project, and 100% tax is exempted for 04 years and 50% tax reduction for 09 years for new investment projects.
Import tax incentives: Import tax exemption for goods on the tax incentive list imported to create fixed assets for the business.

IV. CURRENT STATUS OF INVESTMENT ATTRACTION AT DEEP C II INDUSTRIAL PARK, HAI PHONG
As of the beginning of 2023, the overall DEEP C II Industrial Park has basically completed the construction of important infrastructure works and has leased to fill more than 30% of the industrial land area of the entire area. Specifically, Deep C2A Industrial Park has leased to fill nearly 24%, Deep C2B Industrial Park has leased to fill more than 80%.

(Pegatron project with investment capital of over 1 billion USD in DEEP C II Industrial Park - Hải Phòng)
Typical projects currently operating in the industrial park include the project to manufacture consumer electronics products of Pegatron Hải Phòng Technology Co., Ltd. (Taiwan nationality) with an investment capital of over 1 billion USD; Project to manufacture plastic products of SIRTEC International (Vietnam) Co., Ltd.; Project to manufacture spare parts and auxiliary parts for vehicle engines of PHA Vietnam Co., Ltd. (Korea); Warehouse and factory for rent project of BW Industrial, Vietnam Industrial Park...; Project to manufacture other rubber products of Pantra Vina Co., Ltd. and a series of other projects. For all land rental needs at DEEP C II Industrial Park - Hải Phòng, please contact KLAND according to the information below!