AN PHUOC INDUSTRIAL PARK - DONG NAI
Dong Nai is considered a province with potential in our country, the gateway to Ho Chi Minh City, and is gradually making strong progress in upgrading urban infrastructure.
Dong Nai is also a promising land for investors. According to the Industrial Zones Authority, in 2018 alone, about 150 hectares of land in industrial zones in the province were leased, exceeding 50% of the plan. Industrial zones with large areas of land for lease in Dong Nai are: Nhon Trach 6 Industrial Zone (Nhon Trach district), Dau Giay Industrial Zone (Thong Nhat district), Giang Dien Industrial Zone (Trang Bom district), Long Khanh Industrial Zone (Long Khanh town), Long Duc Industrial Zone, Loc An - Binh Son Industrial Zone (Long Thành district)... Increased leasing demand has caused most Industrial Zones in Dong Nai to adjust land lease prices from 4 to 10 USD/m2 for the entire lease period of about 40 years since mid-2018.
According to forecasts by economic experts, in the coming years, Dong Nai will still be an attractive destination for many domestic and foreign investors. Especially when Long Thành International Airport and expressways are built and put into operation, Dong Nai will be the transportation hub of the Southern region. Therefore, many businesses want to invest in the industrial sector and other fields in Dong Nai province. According to the Dong Nai Industrial Zones Authority, the remaining land area not leased in the province's industrial zones is about 1,613 hectares.
An Phước Industrial Park - Dong Nai is expected to be an industrial park trusted by many foreign investors in the field of supporting industries and safe production design industries that do not cause environmental pollution.
Priority areas: Textile dyeing, Garment, Footwear; Household appliances made of wood, plastic, aluminum, iron, enamel; Mechanics; Electricity; Electronics; Building materials.
Geographical location of An Phước Industrial Park - Dong Nai
An Phước Industrial Park - Dong Nai is located in An Phước commune, Long Thành district, Dong Nai province. It is an industrial park located in the transportation hub area of the key area of Southern Vietnam. Thanks to this, travel and trade between adjacent key areas are extremely easy and convenient.
- 47km from the center of Ho Chi Minh City (60 minutes by car)
- 30km from Ho Chi Minh City High-Tech Park (45 minutes by car)
- 20km from the center of Bien Hoa City (40 minutes by car)
- 45km from Thi Vai - Cai Mep port (60 minutes by car)
- 35km from Cat Lai port (45 minutes by car)
- 45km from Tan Son Nhat airport (60 minutes by car)
- 18km from Long Thành airport (20 minutes by car)
Infrastructure of An Phước Industrial Park - Dong Nai
An Phước Industrial Park - Dong Nai is invested in extremely modern and convenient infrastructure. Infrastructure such as electricity supply system, water supply, traffic roads, and communication information at An Phước Industrial Park are invested and built ready to serve investment projects
Internal traffic system
- Internal roads are covered with hot asphalt concrete and designed according to Vietnamese standards, H30 load, ranging in width from 20m to 40m, meeting the transportation needs of large tonnage container trucks.
- All areas in the industrial park are connected to the internal traffic road system, ensuring easy internal traffic
Electricity supply
Using the national grid power source, 22KV voltage:
- Normal hours: 1,555 VND/Kwh
(From Monday to Saturday: 4am – 9:30am; 11:30am – 5pm; 8pm – 10pm; Sunday: 4am– 10pm).
- Off-peak hours: 1,007 VND/Kwh
(Every day of the week: 10pm – 4am).
- Peak hours: 2,871 VND/Kwh
(From Monday to Saturday: 9:30am – 11:30am; 5pm – 8pm).
Unit prices may change according to State regulations.
Water supply
- The water source is supplied to ensure the production and living needs of investors.
- Dong Nai One-Member Limited Liability Water Supply Company, capacity 10,000m3/day, night
Telecommunications
- With information and communication services from VNPT, FPT, Viettel... meeting the needs of customers in the industrial park.
- Transmission speed parameters:
- ADSL: maximum 8MB/s.
- Fiber optic cable: maximum 90MB/s.
Wastewater treatment
- Total capacity: 6,000m3/day night (phase 1 is 2,000m3/day night)
- Industrial Park wastewater treatment standards: QCVN 40:2011/BTNMT, column A
- Wastewater treatment fee: 0.32USD/m3 (excluding tax)
- The amount of wastewater is calculated as 80% of the amount of clean water supplied.
To learn more, please contact us by phone or send your request to email: contact@kland.vn .