Overview of Gò Dầu Industrial Park – Dong Nai
Gò Dầu Industrial Park was established under Decision No. 662/TTg dated October 18, 1995 of the Prime Minister with an area of 330 ha (excluding Vedan Vietnam Industrial Company located outside the industrial park). Sonadezi Company is in charge of managing the construction and business of technical infrastructure services of Gò Dầu IP.
Some typical businesses: AK Vina Co., Ltd; Taicera Ceramic Industry Joint Stock Company; APL International Co., Ltd
Geographical location of Gò Dầu Industrial Park
Gò Dầu IP is built in Phước Thái commune, Long Thành district, Dong Nai province, located in the southern key economic region (including Dong Nai, Ho Chi Minh City, Ba Ria - Vung Tau and Binh Duong). It is one of the few industrial parks with an in-land port convenient for importing and exporting goods.
- Distance to Ho Chi Minh City center: 67 km, Bien Hoa City: 42 km
- Distance to Long Thành International Airport: 12 km
- Distance to Bien Hoa station: 42 km, Song Than station: 54 km
- Distance to Gò Dầu port: 0.5 km, Vung Tau port: 40 km
Infrastructure of Gò Dầu Industrial Park
Electricity is supplied stably by Dong Nai Power One Member Company Limited, ensuring to meet the needs of businesses throughout the IP.
The water supply system is provided by Phu My Water Supply Joint Stock Company with a receiving capacity of 10,000 m3/day and night.
- Information and communication:
Convenient telecommunications system with 960 automatic IDD switchboard circuits with VIBA 40 channel system for direct international communication, high-speed ADSL Internet connection
The drainage system is installed along internal traffic routes to ensure the collection of all rainwater and wastewater from factories in Gò Dầu Industrial Park.
Wastewater is centrally treated at the plant located in the industrial park.
With a complete system of traffic signs, speed bumps, traffic warning lights, road markings, and street lights, the road surface is covered with asphalt concrete with a load (H30) to ensure fast and convenient traffic and transportation of goods.
Fire prevention and fighting system according to standards
Investment incentives in Gò Dầu Industrial Park
Tax exemption for 02 years; 50% reduction for the next 04 years (Decree 218/2013/ND-CP)
Human resources, salary levels, costs in Gò Dầu Industrial Park
Abundant labor resources with an average salary for unskilled labor of 170 USD/person/month, and for technical labor is about 250 USD/person/month.
Management fees, electricity fees, water fees, and wastewater treatment fees are calculated according to state regulations for Dong Nai province.
Evaluate
Complete infrastructure.
Synchronous traffic system.
Convenient geographical location: near airport, railway station, port
The industrial park no longer has land for lease.
Our services
With many years of experience in advising on land laws and surveying and working with management boards of industrial parks and foreign investors in industrial parks, we provide a comprehensive service package for domestic and foreign investors in industrial parks nationwide, including:
- Consulting on land law and real estate
- Survey, visit factories and industrial park land service
- Legal services for applying for business licenses and investment certificates in Vietnam
- Legal consulting services: drafting, negotiating, signing contracts
- Notarization, authentication, deposit support, bank loans services
For detailed information, please refer to the specifications table below.
VIEW MORE FULL INFORMATION DETAIL