Tien Hai Industrial Park – Thai Binh
Tien Hai IP- Incentive for coastal economic Park in Thai Binh province
Over View
Total area: 466 ha
Operation time: 2017 – 2067
Tien Hai is a district which not only has the oldest industrial zone in the province but also was expanded and invested the synchronous infrastructure. From 2015, Vietnam National Oil and Gas Group brought the first gas flow from offshore of Red River to the coast, met the demand on energy in service of hi-tech projects using much fuel. With the capacity of about 200 million m3 of gas/year, the Northern Low Pressure Gas Distribution Enterprise provided to Tien Hai Industrial Zone and compressed air to industrial zones in the North for about 95% capacity of the mine, contributed to solving problem of shortage of natural gas in industrial production.
With this advantage, Tien Hai Industrial Zone is becoming a key industrial zone using gas in the North, taking gas as a base to develop and attract the investors. In addition, Tien Hai has 16 communes located in Thai Binh economic zone. This is a general economic zone including functional subdivisions such as Thai Binh Power Center; industrial zones and clusters; port and port services area urban areas, service areas; tourist areas, resorts and entertainment areas... All these areas are applied mechanisms and policies with the highest levels of encouragement and incentives under the current law. Therefore, this is also an opportunity for investors to choose Tien Hai to build the production factories.
Location
Tien Hai Industrial Park is located in 4 communes of Dong Co, Dong Lam, Tay Giang and Tay Son, Tien Hai districts, Thai Binh Province, Vietnam
Tien Hai - IP (Thai Binh Province, Vietnam) is Located on the coastal road linking Quang Ninh to Ninh Binh and Tien Hai IP is only 2 km far from the new coastal highway which links 6 provinces from Quang Ninh to Thanh Hoa:
• Distance to Hanoi city center: 120km,
• Distance to Thai Binh city: 30km
• Distance to Noi Bai international airport: 140 km
• Distance to Hai Phong port: 74 km
• Distance to Cai Lan – Quang Ninh port: 110 km
Infrastructure of Tien Hai Industrial Zone, Thai Binh Province, Vietnam
Internal transport system:
The heart of Dong Chau road averages: + 1.16m.
Essence of the average planning status: -0.16m
The heart of the planning road in the industrial cluster averages: + 1.15m.
Ground leveling, average design (excluding hard structure part) is + 1.0m.
The main traffic route is Dong Chau road running along with a width of 32m; roadway 14m; 9m on each side corridor including 4m sidewalk, 5m green tree strip.
Road No. 1 in the corner with Dong Chau Street runs between the industrial zone with a width of 23m; roadway 14m; sidewalks on each side 4.5m (4.5 + 14 + 4.5).
The southern boundary of the industrial zone (line 5) connects from road 221A running parallel to Dong Chau road and the western contour (line 4) separating the industrial zone and urban residential area with the width of 18.5m. : roadway of 10.5m; sidewalk on each side 4m.
Northern contour (line 6), east contour (line 3), other internal roads (line 2, No. 7) in the industrial park with a width of 15.5m; road bed 7.5m; sidewalk on each side 4m
Power supply for the industrial park is taken from 110KV station of Long Hau bridge. The 35KV power line to the east of the industrial zone pulls through the Long Hau River and runs along Dong Chau road and connects with the factories. 35KV power line for the west of the industrial park is pulled by underground cable through Long Hau bridge, connecting to the road No. 1, No. 6 and No. 3. Electric lighting the Industrial Park with high pressure mercury lamp.Power is supplied from national grid through 110/22KV transformer station with capacity of 63 MVA
Water supply system: Water source is salt water. In the immediate future, it can be taken from Long Hau River, but in the long term it must be taken from Tra Ly River.
The Tien Hai Industrial Park water plant was built with a capacity of 6.000 m3 / day.
Waste Water treatment system: Waste water is treated locally at each factory meeting the standard of C according to TCVN 5945-1995 standards and then collected by separate system and brought to the wastewater treatment station.
The drainage system is placed in the sidewalk and discharged to the waste water treatment area to the east of Long Hau River adjacent to the Kien Giang River to be treated to meet the standards prescribed before the area to the Long Hau River.
Solid wastes (mainly porcelain scraps, construction materials, etc.) are preliminarily classified and collected by factories and transported to landfills to the west of Long Hau river for burial.
The exhaust gas before discharging into the air must meet the requirements of concentration limits according to TCVN 5939-1995
Wastewater treatment plant is built with a capacity of 3.000m3 / day and night. Wastewater is treated locally at factories before being discharged into the general waste water drainage system of the Industrial Park.
CNG Station with capacity of 1,000,000 m3/day supplies the gas for whole Northern Vietnam
Telecomunications: Telecommunication system reach the international standard
List of famous investors in Tien Hai IP
Provina Co.,ltd
Viglacera Tien Son Joint Stock Company
Vina Kangaroo Garment Limited Company
OHIO Ceramics Joint Stock Company
Song Hong Petroleum Limited Company
NICOTEX Dong Ai Joint Stock Company
Ai Binh Cement Joint Stock Company
Business line for investors in Tien Hai Thai Binh – Industrial Park
Multidisciplinary: heavy industries, construction materials, consumables used gas fields: ceramic, porcelain, glass, Cement
Policies to attract investment in Tien Hai – Thai Binh Industrial Park
CIT incentive 10% for 15 years
Tax exemption for the first 4 years
50% tax reduction for the next 9 years
Land and Factories for rent in Tien Hai – IZ (Thai Binh Province)
Available land for building factory. Vigalcera provides ready built factories with a standard area of 2,500 – 5,000m2. Factory is modern, designed to meet customer requirements
Viglacera also undertakes the design to meet specific requirements on the factory.
The land fee: 60-80 USD /m2
Land lease term: 2017 – 2067
Electricity prices: According to the Government's price set
The market salary (2019) included amount for over time can be up to 180 – 250
USD/person/monthManagement fee: 0.3usd/m2/year
Advantages of Tien Hai - IP
Abundant and low-cost labor force.
CNG station with a capacity of 1.000.000 m3/day.
Incentive for coastal economic zone.
Police station, polyclinic, banks, logistics center, post office… are located near the Industrial Park
Our services:
Kland has experience providing the following services:
Land consulting, factory visiting
Procedures, conditions, business licenses, investment certificates in Vietnam
Drafting, Negotiating for Contract
Legal advisory in Vietnam
VIEW MORE FULL INFORMATION DETAIL