I. LEGAL INFORMATION AND LOCATION OF HOA PHU INDUSTRIAL PARK VINH LONG
Hoa Phu Industrial Park - Vĩnh Long was approved for investment in 2004 with a phase 1 area of 137.1 ha, which was later adjusted down to 121.59 ha during implementation (of which the area of industrial land for lease is 94.8 ha), with a total investment of 103 billion VND, invested by the state budget and completed construction and put into operation from 2006. On September 29, 2009, in Official Dispatch No. 1816/TTg-KTN, the Prime Minister approved the expansion of Hoa Phu Industrial Park (phase 2) with an area of 130 ha, and at the same time added Hoa Phu Industrial Park Vĩnh Long province to the planning of industrial parks in Vietnam.
On August 14, 2007, the Hoa Phu Industrial Park Project - Phase II was assigned by the People's Committee of Vĩnh Long province to Hoa Phu Joint Stock Company to invest in construction and business of infrastructure. On August 31, 2007, Hoa Phu Industrial Park phase II was approved by the People's Committee of Vĩnh Long province for detailed planning. construction ratio of 1/2000 in Decision No. 1752/QD-UB with a total approved planning area of 137.16 ha (including 129.91 ha of industrial park land and 7.25 ha of land outside the industrial park), then the area of industrial park land was adjusted down to 129.38 ha (of which the area of industrial land for lease is 94.95 ha). The Hoa Phu Industrial Park phase II project officially went into operation in 2010 with an operating term of 50 years (2010-2060). The total area of phase I and phase II after being put into operation is 250.97 ha. According to the planning of Vĩnh Long province for the period 2021-2030 approved by the Prime Minister, Hoa Phu Industrial Park is expected to be planned for phase 3 expansion with a planned area of 157 ha.

In terms of regional connectivity, the industrial park is located adjacent to National Highway 1A and:
- 8 km from the center of Vĩnh Long city
- 32 km from the center of Can Tho city; 130 km from Ho Chi Minh City center
- 34 km from Cai Cui port; 38 km from Can Tho International Airport
- 135 km from Tan Son Nhat Airport; 140 km from Cat Lai port
II. HOA PHU INDUSTRIAL PARK VINH LONG INFRASTRUCTURE SYSTEM
Other infrastructure utilities: Greenery system, lighting system, telecommunications system, fire protection system, rainwater drainage system, solid waste collection and treatment system...


III. LAND LEASE COST OF HOA PHU INDUSTRIAL PARK VINH LONG
IV. CURRENT STATUS OF INVESTMENT ATTRACTION IN HOA PHU INDUSTRIAL PARK
Typical projects operating in Hoa Phu Industrial Park include the garment project of Ty Xuan Co., Ltd. (China); The instant noodle production project of ACECOOK Vietnam Joint Stock Company Vĩnh Long branch (Japan); Project to produce products from wood, bamboo and rattan of Vietnam Housewares INTL Joint Stock Company; Animal feed production project of Hai Dai Vĩnh Long Co., Ltd. and a series of other projects from the Netherlands, Korea, Japan and China.


