Loading, please wait a moment...

Dong Quế Sơn - Quảng Nam Industrial Park

Quế Sơn Industrial Park, put into operation in 2013, is a relatively new industrial park of Quảng Nam. It is a multi-sectoral industrial park, attracting many domestic and foreign investors.

1

Overview

Code: DONGQUESON-IP-QNA (Khu công nghiệp)

Price: $30 - Chưa bao gồm VAT

Code: DONGQUESON-IP-QNA (Khu công nghiệp)

Price: $30 - Chưa bao gồm VAT

Code: DONGQUESON-IP-QNA (Khu công nghiệp)

Price: $30 - Chưa bao gồm VAT

Code: DONGQUESON-IP-QNA (Khu công nghiệp)

Price: $30 - Chưa bao gồm VAT

Code: DONGQUESON-IP-QNA (Khu công nghiệp)

Price: $30 - Chưa bao gồm VAT

Code: DONGQUESON-IP-QNA (Khu công nghiệp)

Price: $30 - Chưa bao gồm VAT

Code: DONGQUESON-IP-QNA (Khu công nghiệp)

Price: $30 - Chưa bao gồm VAT

Code: DONGQUESON-IP-QNA (Khu công nghiệp)

Price: $30 - Chưa bao gồm VAT

Name: Dong Quế Sơn - Quảng Nam Industrial Park

Total Area: 211.3ha

Address: Xã Hương An, huyện Quế Sơn, tỉnh Quảng Nam

Investor: DONGQUESON-IP-QNA

Operation ending time: 01/2019 - Start time: ---

Price: 30 USD/m2 Chưa bao gồm VAT

building density: 60 (%)

Fill rate: Fill rate: 40%

Note:

Miễn thuế 02 năm ; Giảm 50% cho 04 năm tiếp theo (Nghị định 218/2013/NĐ-CP)


Keyword: dong quế sơn vietnam, leasing price dong quế sơn, leasing price dong quế sơn vietnam, factory dong quế sơn, leasing price land dong quế sơn, dong quế sơn for rent in vietnam


2

Information detail

Dong Quế Sơn - Quảng Nam Industrial Park

DONG Quế Sơn INDUSTRIAL PARK - QUANG NAM

Overview of Dong Quế Sơn Industrial Park

Dong Quế Sơn Industrial Park is located in Hương An commune, Quế Sơn district, adjacent to National Highway 1A, 35km to the South of Da Nang City - the socio-economic center of the Central and Highlands - and 30km to the North of Tam Ky City, convenient for road, waterway, railway and air transport. To create more investment attraction, and unlock the industrial potential of Quế Sơn Industrial Park as well as Quảng Nam province. On October 24, 2016, the Prime Minister allowed the addition of expanded planning for Dong Quế Sơn Industrial Park from 211 ha to 457.72 ha in the development plan of industrial parks nationwide until 2020.

Dong Quế Sơn Industrial Park is located next to National Highway 1A, 35km from Da Nang City - the socio-economic center of the Central region - and the Central Highlands to the South, and 30km from Tam Ky City to the North. It is assessed as having a convenient location for transport links. Specifically

Geographical location of Dong Que Son industrial park
Distance to the nearest major city:: Distance to Da Nang City: 38km;
Distance to the provincial center: 30km;
Distance to the nearest airport: Da Nang Airport: 40km;Chu Lai Airport: 60km;
Distance to the nearest railway station: Da Nang Station: 40km; Tam Ky Station: 30km;
Distance to the nearest seaport: Distance to Da Nang City: 38km.


Infrastructure of Dong Quế Sơn Industrial Park

Transportation system:

Main axis system: The main axis system is 29m wide, including 4 lanes with a width of 15m, a median strip of 2m wide, and sidewalks on each side of 6m wide;

Internal traffic system: The internal road system is 22.5m wide, including 2 lanes with a width of 10.5m, sidewalks on each side of 6m

Electricity system:
National electricity system: 22kv
Water system:
Water volume (m3/day): 2,900m3/day
Wastewater treatment:
Maximum treatment capacity (m3/day): 2,500 (m3/day and night); Current wastewater treatment capacity (m3/day): reaches 15% of capacity
Waste treatment:
Factory standard: The industrial park does not have one; Current waste treatment capacity (tons/day): Industrial park waste is contracted with the urban environment company for collection
Fire fighting system:
Fire hydrants are installed along the main roads and at intersections
Information and communication:
Internet: Installing underground cable system along the sidewalk of the main road

Land rental costs and investment incentives

Land rental price: 30-35 USD/1m2/rental term (price does not include VAT)

Management fee: 0.25USD/m2/year (price does not include VAT)

Electricity price

Peak hours: 3,076 VND/kw; 
Normal hours: 1,685 VND/kw; 
Off-peak hours: 1,100 VND/kw
Water price: Clean water price: 11,000 VND/m3
Wastewater treatment fee: Water treatment price (m3): 14,000 – 22,000 VND/m3; 
Investment incentives
Corporate income tax incentives: Exemption for 2 years, 50% reduction for the next 4 years.
Import tax incentives: Import tax exemption for imported goods to create fixed assets.

Our services:

With many years of experience in consulting on land laws, and surveying and working with management boards of industrial parks, foreign investors in industrial parks, we provide a comprehensive service package for domestic and foreign investors in industrial parks nationwide including:

Consulting on land laws and real estate;
Survey services, visiting factories, industrial park land;
Legal services for applying for business licenses and investment certificates in Vietnam;
Legal consulting services: Drafting, Negotiating, Signing contracts;
Notarization, authentication services, support for deposits, bank loans.

For detailed information, please refer to the parameter table below.


VIEW MORE FULL INFORMATION DETAIL

Contact

Please fill your inquiry detail to the form as bellow

Security Code: Result of 7 + 55 =

Contact us

plus

Other Industrial Park

img

Request Form

img

Booking