Dong Van III Industrial Park – Ha Nam
Dong Van III IP – Dedicated to Japanese investors
Overview of Dong Van 3 Industrial Park, Ha Nam Province
As one of the two supporting industrial zones in the North of Vietnam approved by the Government, Dong Van III Supporting Industrial Zone was established on 25/4/2017 in Duy Tien district, Ha Nam province with the area of 300 ha (expected to be expanded to 800 ha) and invested by Dong Van III – Ha Nam Industrial Zone Infrastructure Development & Investment Joint Stock Company. Phase 1: 131.59 ha ; Phase 2: 168.41 ha
Dong Van III Supporting Industrial zone is oriented as a supporting industrial zone with such sectors as: electronics, telecommunications, automobile assembling and manufacturing, mechanical manufacturing and hi-tech industrial products. Its operation term is 70 years since the date of decision on establishment. This is an industrial zone dedicated to Japanese investors.
Location:
Dong Van III industrial Zone is located Next to National Road 1A, Hanoi – Cau Gie – Ninh Binh – Thanh Hoa Highway, National road 38 and North – South Railway.- Distance to Hanoi: 40km, Ha Nam Province, Viet Nam.
• 76km far from Noi Bai International Airport
• 40km far from Hanoi Central, 11 km from Phu Ly city
• 112km far from Hai Phong Sea Port
Infrastructure of Dong Van III Industrial Park/Zone, Ha Nam Province, Vietnam
Land condition – high ground level, without risk of flood. The land is filled up with sand, compaction: K = 0.85; Ground level: 3.5m, Land plots have an area of from 1 ha to 50 ha, including land area for small and medium enterprises with the area from 1.000 m2 to 5.000 m2.
In particular, the industrial zone has workshops for lease for small enterprises with an area of 500-1,000m2 or larger depending on the investors’ needs. There are land plots planned to build housing for experts and workers with an area of 6.25 ha.
Internal transport system: 2-4 lands Width of Main road 42m and 15 – 20 – 30 meters Width of branch road.
Power System: Power lines: – The electricity supplied to Dong Van III Supporting Industrial Zone is guaranteed to be stable. Particularly, since January 2018, Dong Van III Supporting Industrial Zone has two 110 kV power stations, including the 110kV Station in Dong Van Industrial Zone and the 110kV Dong Van III Station. The parallel operation of the two 110kV Stations will help to minimize the electricity outage in case of incidents. These two 110kV stations are managed by the Northern Grid Company.
– The electricity lines in the industrial zone according to approved planning is 22 kV line, which is managed, operated and maintained by Northern Power Consulting and Construction Joint Stock Company. Simultaneously, this company also conducts electricity connection and provides maintenance service, etc.
– Stable electricity supply: Electricity supplied to enterprises in Dong Van III Supporting Industrial Zone is always stable at voltage from 22.0 to 22.3kV. According to statistics of the power outage in the first quarter of 2018 in Dong Van III Industrial Zone, there is only one time of electricity cut on Sunday to deal with the risk of power metering system failure.
– Recloser: Enterprises in Dong Van III Industrial Zone must install a recloser. With this device, in case of electricity incidents occurring in an enterprise, it will not affect all other enterprises in the industrial zone, which helps to ensure electricity safety in the industrial zone.
– Electricity price applied in the industrial zone is the price applied in the whole country in accordance with Decision No. 4495/QD-BCT dated November 30, 2017 of the Ministry of Industry and Trade regulating electricity prices.
Water supply system: Presently, fresh water in Dong Van III Supporting Industrial Zone is supplied by Ha Nam Clean Water Joint Stock Company from Phu Ly Fresh Water Plant with capacity of 60,000 m3/day. Fresh water meets the quality standards prescribed by Vietnam’s regulations.
In September 2018, Ha Nam Clean Water Joint Stock Company will complete the Red River Fresh Water Plant with capacity of 200,000 m3/day in Moc Nam Commune, Duy Tien District, Ha Nam Province. This plant will be the main fresh water supply source for Dong Van III Supporting Industrial Zone and surrounding areas.
Waste Water treatment system: There is a wastewater treatment plant with a current capacity of 2,000 m3/day and expanded to 7,000 m3/day, managed and operated by DUCAN Environment Technology Joint Stock Company. It can meet demand of enterprises operating in the industrial zone. (The wastewater treatment system must meet the standards type A (QCVN 40:2011/BTNMT),
Fire protection: Fire prevention police station aparts only 1.5 km from the IZ:To ensure fire prevention and fighting for Dong Van Industrial Zones, in the Dong Van I Industrial Zone – 1.5km from the gate of Dong Van III Industrial Zone, there is a fire prevention police station with 15 standing firefighters.
In addition, the industrial zone also arranges a fire hydrant system along the internal roads of the industrial zone (every 150m with a fire hydrant).
Telecomunications: Signed memorandum of understanding with KDDI; lines, Fiber optic capcities and Broadband ADSL
List of Investors in Dong Van 3 Industrial Park : Almost Investors In Dong Van III-IP is from Japan:
• Ohtsuka sangyo material viet nam co., ltd
• Osawa viet nam trading co., ltd
• Chubutsu viet nam co.,ltd
• Seiko precision parts vietnam co., ltd
• Taniguchi plastic vietnam co., ltd
• fuji electric industry vietnam co., ltd
• shikoku cable vietnam’s branch
• Kuwana’s branch
• Fuji star roof co., ltd
• Vina ito co., ltd
• Hashimoto cloth
• Branch of ykk vietnam co., ltd
• Branch of ojitex hai phong co., ltd
• Pronics hanoi co., ltd
• Tdi electronics vietnam co., ltd
• Hojitsu vietnam co., ltd
• Sawada precision
• Kajitech vietnam
• Yan cang ha nam co., ltd (icd)
Business line for investors in Dong Van III - IP:
All kinds of industries, especially for supporting industries: electronics, telecommunications, automobile assembling and manufacturing, mechanical manufacturing and hi-tech industrial products.
Policies to attract investment in Dong Van III Industrial Park
Corporate income tax (for products considered as supporting industrial products):
– Preferential tax rate: 10% for 15 years;
– Tax exemption for 4 years, tax reduction 50% for the next 9 years.
Import tax is exempt for goods imported to create fixed assets in accordance with the provisions of Law on import and export tax and the guiding documents.
Infrastructure rental: The rental is very competitive in comparison to other supporting industrial zones. Factory rental may be exempted or reduced during the installation of machinery and equipment.
Supporting enterprises fulfilling administrative procedures such as: Investment registration certificate, construction license, procedures relating to land, certification of supporting industry project, etc.
Funding support for vocational training, training local laborers for Enterprises.
Land and Factories for rent in Dong Van III - Industrial zone
Land is divided by plots with the minimum area of 5,000 m2,
Factory: Ready built factory for rent: the area from 500m2 to 1,000 m2.
The rental facilities: 65-85 USD /m2
Land lease term: up to 70 years (to 2087)
Electricity prices: According to the Government"s price set
Labor costs: About 150 - 300USD/person/month, subject to the position.
Management fee: 0.3usd/m2/year
Utilities of Dong Van 3 - Industrial Park Ha Nam
To better serve the operation of enterprises in the industrial zone, ICD project in Dong Van III Supporting Industrial Zone of Tan Cang – Dong Van Ha Nam Joint Stock Company (subsidiary of Saigon Newport Corporation – an enterprise directly under Vietnam People’s Navy) with an area of above 9.3 hectares was started its construction in April 2018. With favorable geographical location, ICD in Dong Van III can provide services such as: leasing warehouse, bonded warehouse, ICD; customs declaration at the ICD in the industrial zone; container services; domestic and international transport; cargo and container transportation by rail, road and inland waterway; multi-modal transportation …, easily coordinate with ICD Hai Phong and other ICDs of the Saigon New Port Corporation for the best transportation of goods. The number of employees in the stable operation time can be up to 100 persons.
Besides the high quality infrastructure, Dong Van 3 IP Industrial Park also provides a wide range of utility services, including:
Bank: BIDV –Duy Tien branch, Vietcombank- Duy Tien branch; Maritime Bank-Duy Tien Branch
All banks located in Dong Van Town (1 km far from Dong Van III IZ);
Apartment for Japanese people: Famille Hanam Service Apartment developed by Fuji Group (Japanese) , less than 01 km from Dong Van III Industrial Zone;
Hospitals: Bach Mai Hospital- Hanam branch; Viet Duc Hospital – Hanam branch now under construction in Phu Ly city (about 18 km far from Dong Van III IZ);
Japanese Restaurant: Tamaya Restaurant located about 01 km from Dong Van III IZ;
Our services:
Kland has experience providing the following services:
Land consulting, factory visiting
Procedures, conditions, business licenses, investment certificates in Vietnam
Drafting, Negotiating for Contract
Legal advisory in Vietnam
VIEW MORE FULL INFORMATION DETAIL