THANH THANH CONG INDUSTRIAL PARK - TAY NINH
I. GENERAL INFORMATION ABOUT THE INDUSTRIAL PARK

Geographical location and regional connectivity of the Industrial Park:

Thành Thành Công Industrial Park in Tây Ninh Province is located in the most prime location in An Hòa Commune, Trảng Bàng District, Tây Ninh Province and the Ho Chi Minh Road passes through the project, adjacent to the Vam Co Dong River, so it is possible to use barges with a load of about 2000 tons to transport goods to the Mekong Delta area.
Tây Ninh Province is considered one of the important international gateways between Vietnam and Cambodia, Thailand, etc. At the same time, the province has an important position in the exchange of goods between the key economic provinces in the South and the provinces in the Mekong Delta region. In addition, Tây Ninh Province also has the Trans-Asia Highway passing through with a length of nearly 28 km, connecting Ho Chi Minh City with Cambodia through the Moc Bai border gate, so this is a huge advantage for industrial parks in Tây Ninh Province in general and Thành Thành Công Industrial Park in particular.
Thành Thành Công Industrial Park has a road traffic system that is easy to move and does not have congestion during peak hours. It can be connected to provinces and cities across the country and abroad by road, sea, rail, and air. Specifically, you can refer to the figure below:

Current Status
Currently, Thành Thành Công Industrial Park has been put into operation, with its potential advantages and the preferential policies of the Tây Ninh provincial government, Thành Thành Công Industrial Park has achieved many successes in attracting domestic and foreign investment.As of March 2021, Thành Thành Công Industrial Park has attracted 82 registered investment projects, including 69 FDI projects and 13 domestic projects.The occupancy rate reaches about 70%, expected to reach 100% in 2022, when the land fund for attracting investment will no longer be available. Therefore, the Industrial Park Management Board, the Investor, and the Tây Ninh provincial government are actively expanding the planning of Thành Thành Công IP to meet the development requirements of the locality, the region, and the nation in order to welcome the new investment wave in the post-Covid-19 era, which is in line with the Government's current policy. Information about the expansion of Thành Thành Công IP will be updated by Kland in the near future.
Thành Thành Công Industrial Park Joint Stock Company has implemented the construction and put into use the centralized wastewater treatment plant in accordance with the law on environmental protection, including technical infrastructure items such as: rainwater drainage system, wastewater drainage system, transportation system, water supply system, wastewater treatment... These items have been basically completed by the investor, meeting the needs of investors to operate.
II. IP INFRASTRUCTURE INFORMATION
Road system in the Industrial Park
Infrastructure
Internal traffic system:
Internal roads are paved with asphalt
Sidewalks are planted with trees to create landscapes
Complete lighting system installed
Power supply system:
110/220kV transformer station right in the industrial park with a designed capacity of 2x63 MVA.
Clean water supply plant system:
Total capacity: 20,000m3/day and night
Wastewater treatment plant:
Total capacity: 16000m3/day and night

III. INVESTMENT COSTS AND INVESTMENT INCENTIVES
Investment costs
Land rental price: 85 USD/m2/rental term (50 years)
Rental period: until September 2059
Management fee: 0.25 USD/m2/year (price does not include VAT)
Electricity price: According to the price list of Tây Ninh Electricity Company at the time of use. Implementing Circular 16/2014/TT-BCT dated May 29, 2014 of the Ministry of Industry and Trade stipulating the implementation of electricity selling prices.
Water price: According to the water price announcement of the water supply unit at the time of use.
Investment incentives:
General incentives: Free for 02 years, 50% reduction in the next 04 years (applicable tax rate 20%)
Incentives for high-tech and supporting industry enterprises: Preferential tax rate of 10% for 15 years, free for 04 years, 50% reduction for the next 09 years.
Import tax: Exemption from import tax on goods that create fixed assets for the project (Equipment, machinery; Specialized transport vehicles in the technology chain and vehicles for transporting workers; Components, details, separate parts, spare parts, jigs, molds, accessories accompanying equipment, machinery, specialized transport vehicles; Raw materials, supplies used to manufacture equipment, machinery in the technology chain or to manufacture components, details, separate parts, spare parts, jigs, molds, accessories accompanying equipment, machinery; Construction materials that cannot be produced domestically).
Some pictures of factories and projects in the Industrial Park:


Our services:
With many years of experience in advising on land laws, and surveying and working with the management boards of industrial parks and foreign investors in industrial parks, we provide a comprehensive service package for domestic and foreign investors in IPs nationwide, including:
Consulting on land and real estate laws;
Service for surveying and visiting factories and industrial park land;
Legal services for applying for business licenses and investment certificates in Vietnam;
Legal consulting services: Drafting, Negotiating, Signing contracts;
Notarization and authentication services, support for deposits, bank loans.
For detailed information, please refer to the parameter table below.