Loading, please wait a moment...

Cum Industrial Park Hai Son - Duc Hoa Dong - Long An

Cum Hai Son - Duc Hoa Dong Industrial Park has a total area of 261 hectares. With the advantages of competitive pricing, reputation, experience, well-invested infrastructure, and convenient transportation location adjacent to Ho Chi Minh City, the industrial park attracts 55 operating businesses.

1

Overview

Code: HAISONDUCHOADONG-IP-LA (Cụm công nghiệp)

Price: $80 -

Code: HAISONDUCHOADONG-IP-LA (Cụm công nghiệp)

Price: $80 -

Code: HAISONDUCHOADONG-IP-LA (Cụm công nghiệp)

Price: $80 -

Code: HAISONDUCHOADONG-IP-LA (Cụm công nghiệp)

Price: $80 -

Code: HAISONDUCHOADONG-IP-LA (Cụm công nghiệp)

Price: $80 -

Name: Cum Industrial Park Hai Son - Duc Hoa Dong - Long An

Total Area: 261.215ha

Address: Xã Đức Hòa Đông - huyện Đức Hòa - tỉnh Long An

Investor: HAISONDUCHOADONG-IP-LA

Operation ending time: 08/2023 - Start time: ---

Price: 80 USD/m2

building density: 90 (%)

Fill rate: Fill rate: 80%

Note:


Keyword: cum industrial park hai son vietnam, leasing price cum industrial park hai son, leasing price cum industrial park hai son vietnam, factory cum industrial park hai son, leasing price land cum industrial park hai son, cum industrial park hai son for rent in vietnam


2

Information detail

Cum Industrial Park Hai Son - Duc Hoa Dong - Long An

HAI SON - DUC HOA DONG INDUSTRIAL CLUSTER, Long An PROVINCE
I. GENERAL INFORMATION
    Cum Hai Son - Duc Hoa Dong has a total area of 261ha. With competitive prices, reputation, experience, well-invested infrastructure, and convenient transportation location adjacent to Ho Chi Minh City, Cum attracts 55 operating businesses, achieving a revenue of VND 1,500 billion.

    The investor of Cum is Hai Son Co., Ltd. Hai Son Co., Ltd. was established in 2003 and is managed by Mr. Trinh Van Hai - General Director. After nearly 20 years of construction and development, Hai Son Group has become a strong brand in the field of Investment - Exploitation - Construction of industrial parks and residential areas.
    In the process of formation and development, the corporation has invested and established member companies. To date, the ecosystem of Hai Son Group has more than 10 member companies and affiliated companies to serve the company's operations.
    With the motto "Quality and Friendliness," Hai Son Group always puts the interests of customers first. The company's operating policies and tenets always aim for a single goal: to bring customers sustainable and long-term values.
The total area of Cum is 261.215 hectares, of which:
  • Land for factories and warehouses: 70%
  • Traffic land: 13%
  • Land for trees and water surface: 12%
  • Other technical areas and structures: 5%
Strengths:
- Very good geology including soil, clay, gravel, under the foundation layer, so the investment cost for building factories is reduced, lower than other areas by 30%.
- Complete waste treatment system.
- Adjacent to HCMC, convenient for transporting goods.
- Complete infrastructure, factories can be built immediately.
- The main road leading into the industrial park is 26 m wide, including sidewalks, both sides of the sidewalk have shady green trees, the secondary roads are 22 m wide.
- Stable power supply (undertaken by Duc Hoa Power Company)

II. GEOGRAPHICAL LOCATION
- Located in Duc Hoa Dong commune - Duc Hoa district - Long An province.
- Long An is a land with a strategic economic position:
  • Is a buffer zone between the East and the Mekong Delta
  • Is the economic gateway of the Mekong Delta region
  • Area near important traffic junctions from Ho Chi Minh City to the western provinces
- In Long An province, as of the beginning of 2020, there were 1,009 projects with a total registered capital of USD 6.15 billion
- In the socio-economic development strategies of HCMC in the coming time, it will aim to see Long An as a satellite city of HCMC, developing the economy in parallel with HCMC

- Long An is located in the golden triangle to welcome the trend of population expansion of HCMC along with Binh Duong and Dong Nai. In the coming years, Long An will become one of the 3 industrial centers of the South
- Projects that have been and are being implemented include:
  • Expanding and upgrading QL1A, QL50, QL62, QL N2 (from Cu Chi running throughout the Dong Thap Muoi region)
  • Ben Luc - Long Thanh Expressway connecting Long An with the port system of Hiep Phuoc, Cat Lai, Cai Mep - Thi Vai and Long Thanh airport
  • Expanding and upgrading DT 830 (dynamic axis of HCMC - Tien Giang - Long An)
  • Long An International Port
- Long An will develop 3 specialized industrial zones, namely Duc Hoa, Can Giuoc, Ben Luc, to serve the planning and relocation of manufacturing plants to one area for management. In addition, Long An province also applies the form of industrial land planning in parallel with residential areas and service industries...
- In which, Duc Hoa district is positioned as a center for developing supporting industries and processing
Understanding and appreciating the importance of the industrial real estate industry in Long An, the leadership of Hai Son Group has boldly invested and developed many projects in the province over the years. Hai Son Group always identifies long-term development direction, investing in sustainable values and being responsible to the community.
Distance to key traffic hubs
  • Distance to QL.1A: 11km
  • Distance to the center of HCMC: 17 km
  • Distance to Tan Son Nhat International Airport: 25 km
  • Distance to the center of Duc Hoa Town: 3 km
  • Saigon Port: 28km
  • Saigon Railway Station: 24km
  • Distance to Vam Co Dong River 4 km

Hai Son IZ is connected to key traffic routes such as: QL1A, Trans-Asia Road, Saigon - Trung Luong Expressway, Provincial Road 825, 830...Waterway traffic is very convenient for transporting goods and materials from the IZ to ports, neighboring provinces and Cambodia. 

III. INFRASTRUCTURE
Transportation system
- Main road:
  • Hai Son - Tan Do Road is connected to Provincial Road 825 with a road surface of 11mx2, a median strip of 2m wide, and sidewalks of 4.5mx2.
  • Road No. 2: has a road surface of 16m wide, a sidewalk of 5mx2 wide, a right-of-way of 36m, and a length of 1,583m.
  • Road No. 4: has a road surface of 16m wide, a sidewalk of 5mx2 wide, a right-of-way of 36m, and a length of 1,670m.
  • Road No. 7: has a road surface of 16m wide, a sidewalk of 5mx2 wide, a right-of-way of 36m, and a length of 1,448m.
  • Road No. 9: has a road surface of 16m wide, a sidewalk of 5mx2 wide, a right-of-way of 36m, and a length of 1,522m.
  • Road No. 10: has a road surface of 16m wide, a sidewalk of 5mx2, a right-of-way of 36m, and a length of 1,483m.
- Secondary road:
  • Road No. 1: has a road surface of 14m wide, a sidewalk of 4mx2 wide, a right-of-way of 32m, and a length of 660m
  • Road No. 3: has a road surface of 14m wide, a sidewalk of 4mx2 wide, a right-of-way of 32m, and a length of 1,306m
  • Road No. 5: has a road surface of 14m wide, a sidewalk of 4mx2 wide, a right-of-way of 32m, and a length of 1,383m
  • Road No. 6: has a road surface of 14m wide, a sidewalk of 4mx2 wide, a right-of-way of 32m, and a length of 1,314m
  • Road No. 8: has a road surface of 14m wide, a sidewalk of 4mx2 wide, a length of 1,356m.
Electricity system:
- Taken from Duc Hoa 110/22 KV – 40+63 MVA transformer station via the current 22KV power line paired along provincial road 825 leading into Hai Son Industrial Park.
Water system
- Underground water plant meets domestic water supply standards.
Fire protection system complies with current regulations of the State
Telecommunications services
- Design criteria:
  • Manufacturing plant area: 12 subscribers/ha
  • Service center area: 24 subscribers/ha
  • Technical construction area: 10 subscribers/ha
- Design objectives and solutions:
  • Ensure communication needs such as fixed telephone subscriptions and mobile information, Internet of the entire area
  • Ensure the reliability of the communication system.
  • Build an underground fiber optic cable from the regional telecommunications station to the central exchange of the industrial park.
- Cables:
  • From the central exchange, there are PVC conduit cables buried along one side of the sidewalk of Hai Son - Tan Do road, roads No. 2, 9 and road No. 10 including main cable, branch cables, collection boxes... to the areas.
  • Install cables and collection boxes with larger capacity than calculated subscription needs to facilitate future subscriber development needs.
  • At cable crossings, there are manholes for pulling cables across the road.
  • The cable route is buried 0.8m deep compared to the finished sidewalk.
  • Capacity of cables depends on information needs on the routes.
  • On the cables, arrange cable cabinets placed on the sidewalk to facilitate connection for factories and enterprises.
  • Total length of underground cables to cable cabinets: 434 m.
  • Underground cable to split box: 1,756m
  • Total number of subscribers in the entire industrial park: 2,327 subscribers.
IV. INVESTMENT INCENTIVES
Exemption for 02 years, reduction of 50% for the next 04 years. Current CIT rate is 22%
VIEW MORE FULL INFORMATION DETAIL

Contact

Please fill your inquiry detail to the form as bellow

Security Code: Result of 8 + 58 =

Contact us

plus

Other Industrial Park

img

Request Form

img

Booking