Loading, please wait a moment...

Leasing factoriy with area of 3000m2 in Binh Xuyen industrial park of Vinh Phuc province

Leasing 1000m2 factory in Binh Xuyen IP

1

Overview

Cho Thuê

Price: $4 - VAT Excluded

Cho Thuê

Price: $4 - VAT Excluded

Cho Thuê

Price: $4 - VAT Excluded

Cho Thuê

Price: $4 - VAT Excluded

Cho Thuê

Price: $4 - VAT Excluded

Cho Thuê

Price: $4 - VAT Excluded

Cho Thuê

Price: $4 - VAT Excluded

Cho Thuê

Price: $4 - VAT Excluded

Cho Thuê

Price: $4 - VAT Excluded

Name: Leasing factoriy with area of 3000m2 in Binh Xuyen industrial park of Vinh Phuc province

Total Area: 3000

Construction Area: 2500m²

Address: Binh Xuyen industrial park, Vinh Phuc

Size (WxLxH): Width: 30 m x Length: 80 m x Height: 9 m

Price: 4 USD/m2 VAT Excluded

Supply Power: 100 KVA

Fill rate: For Rent

Note


Keyword: leasing factoriy with area of 3000m2 in binh xuyen industrial park of vinh phuc province vietnam, leasing price leasing factoriy with area of 3000m2 in binh xuyen industrial park of vinh phuc province, leasing price leasing factoriy with area of 3000m2 in binh xuyen industrial park of vinh phuc province vietnam, factory leasing factoriy with area of 3000m2 in binh xuyen industrial park of vinh phuc province, leasing price land leasing factoriy with area of 3000m2 in binh xuyen industrial park of vinh phuc province, leasing factoriy with area of 3000m2 in binh xuyen industrial park of vinh phuc province for rent in vietnam

Industrial Park: Khu công nghiệp Bình Xuyên - Tỉnh Vĩnh Phúc (view detail »)

2

Information detail

Leasing factoriy with area of 3000m2 in Binh Xuyen industrial park of Vinh Phuc province

Area: 3000m2 (1500 x 2)
Price: 4 USD / m2 (excluded VAT)
Handover time: 3/2020
Please contact Kland for advice on factory leasing procedures, as well as check the licenses, investment certificates and business registration for foreign businesses.

Location:
Next to Binh Xuyen district,
next to Highway 2 (Noi Bai - Lao Cai);
18 km from Noi Bai International Airport,
45 km from the center of Hanoi capital,
160 km from Cai Lan deepwater port (Quang Ninh), close to the snow of Hanoi - Lao Cai - Kunming railway (China), 2 km from Railway station.
Synchronous technical infrastructure: 110/35/22 kV power station with a capacity of 126 MVA, convenient transportation system, Dao Duc water plant with a capacity of 20,000m3 day and night, rainwater drainage and wastewater treatment system private; convenient financial, banking and customs services.
  • The factory is designed according to industry standards, heat-resistant corrugated iron roof, zamil steel frame, high concrete floor, with transformer station.
  • The factory is located outside the IP, next to Japanese companies, it can be put into production immediately.
  • Located on the main road, containers travel freely.
  • Security is guaranteed.


Contact

Please fill your inquiry detail to the form as bellow

Security Code: Result of 4 + 83 =

Contact us

plus

Other Industrial Park

img

Request Form

img

Booking