I. LEGAL INFORMATION AND LOCATION OF SONG HAU 2 INDUSTRIAL PARK
Sông Hậu 2 Industrial Park in Hậu Giang Province was approved for supplementation by the Prime Minister in the Project on planning for the development of industrial parks in Hậu Giang Province in Official Dispatch No. 329/TTg-CN dated April 28, 2023. The industrial park has a planned area of 380 hectares with a planned location in Mái Đầm town and Phu Huu commune, Châu Thành district (not overlapping with the established Phu Huu A industrial cluster phase 3 area). According to the planning of Hậu Giang province for the period 2021-2030, the planned area of Sông Hậu 2 industrial park is adjusted to increase to 430 hectares.On August 3, 2023, Sông Hậu 2 Industrial Park was approved for construction sub-zone planning under Decision No. 1320/QD-UBND of Hậu Giang Provincial People's Committee. Accordingly, Sông Hậu 2 Industrial Park has a first-phase scale of 380 hectares, with the planned location in Mái Đầm town and Phu Huu commune, Châu Thành district. The northeast boundary of the industrial park borders the Hau River, Song Hau Thermal Power Plant and the Nam Song Hau National Highway, the southeast borders Gia Bat canal and Provincial Road 925, the northwest borders Cai Dau canal and the southwest borders a residential area. The total area of industrial land for lease is 263.95 hectares, accounting for 69.46% with a maximum construction density of 70% and a maximum height of 5 floors.

Regarding regional connectivity location, Sông Hậu 2 Industrial Park has the following location:
- 7 km from Cai Cui port
- 23 km from Can Tho International Airport
- 14 km from Can Tho city center
- Adjacent to National Highway 91B
II. INFRASTRUCTURE SYSTEM OF SONG HAU 2 INDUSTRIAL PARK
Internal traffic road system: the main axis of the IP has a cross-sectional width of 30 m, of which the road surface width is 18m; branch roads in the industrial park have a cross-sectional width from 22.5m-26m, road surface width from 10.5m-18m. Traffic routes are arranged with sidewalks and walkways on both sides of the road. The internal traffic road connects to National Highway 91B, 80m wide and District Road 38, 32m wide, creating convenient road traffic connections.III. CURRENT INVESTMENT STATUS OF SONG HAU 2 INDUSTRIAL PARK
Sông Hậu 2 Industrial Park is registered for investment by Kinh Bac City Development Holding Corporation - CTCP with a total expected investment capital of VND 5,568.9 billion (including VND 835.5 billion of contributed capital and VND 4,734.4 billion of loan capital), the expected progress is to complete and put into operation for lease from June 2026. The project is currently in the process of completing investment policy procedures and has not yet been started. The latest information about Sông Hậu 2 IP in Hậu Giang Province will continue to be updated by KLAND in the near future.