I. LEGAL INFORMATION AND LOCATION OF PHU MY 3 SPECIALIZED INDUSTRIAL PARK
On December 20, 2007, Phu My III Industrial Park was approved for detailed planning at a scale of 1/2000 in Decision No. 4653/QD-UBND of the People's Committee of Bà Rịa province Vũng Tàu with a total planned area of 993.81 hectares, of which the planned land area for industrial park construction is 802.52 hectares, the remaining area is for the construction of river ports, warehouses and other infrastructure. After that, Phu My III Industrial Park was officially established in Decision No. 3565/QD-UBND dated October 22, 2009, of the Provincial People's Committee. The Phu My 3 industrial park construction project has a total investment of over 6,000 billion VND, invested by Thanh Binh Phu My Joint Stock Company.

Phu My III Specialized Industrial Park was adjusted for detailed planning at a scale of 1/2000 in Decisions No. 2040/QD-UBND dated September 3, 2015, Decision No. 2742/QD-UBND dated September 28, 2017, and Decision No. 2789/QD-UBND dated September 9, 2022, of the People's Committee of Bà Rịa province Vũng Tàu. After three detailed planning adjustments, Phu My 3 Specialized Industrial Park currently has a total planned area of 1,050.81 hectares, including:
- Land area for building Phu My 3 industrial park is 999 hectares (including 802.52 hectares of concentrated industrial park land and 196.48 hectares of warehouses, port area, utility services, sports, golf course, green trees and water surface land), of which the total area of industrial land for lease is 491.47 hectares (accounting for 61.24% of the planned area)
- Other types of land are 51.81 hectares (existing works, green land isolating liquid gas pipelines, other water surface land).
In terms of nature, Phu My 3 Industrial Park is a specialized industrial park under the general planning of Phu My new urban area, with the following functions:
- Heavy Industrial Zone: attracting energy industries, chemical products, metallurgy, mechanics, casting, plating, dual manufacturing, mineral processing, fertilizers, oil refining, construction material production, plating, molds, solid waste treatment...
- Supporting industry: manufacturing machinery, telecommunications, electronics, assembling automobile components, spinning, textiles, leather and footwear industry..
- Ports, warehouses and other utility services: domestic ports, general ports, ICD dry ports, container warehouses, bonded warehouses, logistics services, expert housing, research areas, restaurants, hospitals, schools, sports, entertainment, shopping areas..
It can be said that chuyên sâu Phú Mỹ 3 Industrial Park is one of the few industrial parks planned with all functional subdivisions and utility services to serve production activities in the industrial park.


- Only 2 km from Cai Mep - Thi Vai deep-water port; 10 km from Thi Vai general port. Cai Mep - Thi Vai deep-water port cluster has a channel depth of 14m-16.5m, allowing it to receive container ships with a tonnage of over 200,000 DWT and has a direct ship line connecting to European and American countries without going through a transshipment port.
- 70 km from the center of Ho Chi Minh City; 26 km from Vũng Tàu city
- 56 km from Bien Hoa city center
- 66 km from Tan Son Nhat International Airport, only 40 km from Long Thanh International Airport
- Directly connected to Cai Mep deep-water port via Provincial Road 818 (Phước Hòa - Cai Mep)
II. INFRASTRUCTURE SYSTEM OF PHU MY 3 INDUSTRIAL PARK
Fire prevention and fighting system: fire hydrants are arranged along traffic routes in Phu My III specialized industrial park with a distance of 2 pillars from 100-150 m, ensuring easy access




Gas supply system: With the orientation of becoming a specialized industrial park serving heavy industry and supporting industry, Phu My 3 industrial park is planned to build 02 natural gas pipelines, the Nam Con Son pipeline and the Bach Ho pipeline, ensuring the ability to supply gas to the industrial park with a gas supply capacity with a heating capacity of 34.5MJ/Nm3 = 8238.6 kcal/Nm3. In addition, inside Phu My 3 industrial park, there is also a natural gas pressure regulating plant with a capacity of 15 million m3/month invested and built by Sojitz Osaka Gas Energy, connected to each land plot in the industrial park, ready to connect and use as needed.
Inland waterway port: inside Phu My 3 industrial park, an inland waterway port is planned to be built including 01 liquid cargo port and 02 drop cargo ports with a designed cargo handling capacity of 5000 tons, providing factories in Phu My 3 industrial park with an additional transportation solution by barge from the inland waterway port to domestic ports or to international port systems such as Cai Mep - Thi Vai, Cat Lai...
In addition, chuyên sâu Phú Mỹ 3 Industrial Park also has a team of engineers and technicians on duty 24/7, ensuring to fix and handle all technical problems in the industrial park to minimize any damage that may occur related to technical problems for factories operating in the industrial park.
Other infrastructure utilities: Phu My 3 industrial park is fully built with functional subdivisions such as urban areas, villas, apartments, hotels, commercial centers, post offices, sports areas, golf courses, restaurants on a total area of 117 hectares, ensuring the living and living needs of experts and workers working at the industrial park.


III. LAND LEASE COSTS AND INVESTMENT INCENTIVES AT PHU MY 3 INDUSTRIAL PARK
- Corporate income tax incentives: investment projects in Phu My 3 industrial park are subject to a preferential tax rate of 17% for the first 10 years of the project (the normal rate is 20%), and 100% exemption from CIT for the first 02 years and a 50% reduction in CIT for the next 04 years.
- Land lease term incentives: Phu My 3 industrial park applies a special land lease policy with a term of 70 years (until 2077), which is the industrial park with the longest operating term in the country today, and 20 years longer than other regular industrial parks.
- Land rent incentives: free of land rent until 2042 at the latest
- Support for investment licensing procedures: investment projects in the industrial park are supported by the investor free of charge for procedures to apply for investment project licenses and establish businesses. At the same time, support for the implementation of other necessary documents on environment, construction, labor, experts, technicians...
IV. CURRENT STATUS OF INVESTMENT CONSTRUCTION AND INVESTMENT ATTRACTION AT PHU MY III INDUSTRIAL PARK
Up to now, chuyên sâu Phú Mỹ 3 Industrial Park has attracted over 30 investment projects with a total investment from Japan, Việt Nam, the United States, Germany, Switzerland...typically can be mentioned the Pocari Sweat ion water production project of the branch of OTSUKA Thang Long Nutrition Co., Ltd. (Japan); the project to produce gypsum products of Yoshino Gypsum Việt Nam Co., Ltd.; the project to produce high-resolution screens for projectors of Coretronic Technology Co., Ltd., the project to produce interior furniture of Nitori Bà Rịa - Vũng Tàu Co., Ltd. (Japan); the project to produce corrugated paper and paper office products of Kraft of Asia Paperboard & Packaging (KOA) Co., Ltd. - Japan...